Kitengela Estate Community Borehole

Kajiado · Kitengela · Residential estate · May 2026

Kitengela Estate Community Borehole
Depth
210 m
Tested yield
9.50 m³/hr
County
Kajiado

210 m borehole supplying 64 households, equipped with a 5 HP submersible pump and a 10,000 L tank on a 9 m steel tower.

The estate had relied on water bowsers for three years. Our hydrogeological survey identified a fractured basalt aquifer at 180–205 m. Air-rotary drilling took four days, with 6" uPVC casing and screens set against the productive zone and a graded gravel pack.

A 24-hour constant-discharge test confirmed a sustainable yield of 9.5 m³/hr. We equipped the borehole with a 5 HP three-phase pump, a DOL panel with dry-run protection, a 10,000 L tank on a 9 m tower and distribution plumbing to the estate mains. Water analysis met KEBS drinking water standards.

Rig set up on site
Rig set up on site
Casing and screens ready for installation
Casing and screens ready for installation
Test pumping in progress
Test pumping in progress