Isiolo Pastoralist Community Water Point

Isiolo · Kinna · Community / NGO · July 2025

Isiolo Pastoralist Community Water Point
Depth
240 m
Tested yield
5.00 m³/hr
County
Isiolo

240 m borehole in an arid area with a 4 kW solar pump, 50,000 L storage, cattle troughs and a kiosk with prepaid taps.

Funded by an NGO partner, this water point serves about 2,500 people and their livestock. Drilling in hard volcanic rock reached 240 m over nine days, with mild-steel surface casing and uPVC below.

A 4 kW solar pump with a 6 kW array lifts water to two 25,000 L tanks. We installed four cattle troughs, a two-tap kiosk with prepaid meters and trained a local committee on maintenance under an annual service contract.

Rig set up on site
Rig set up on site
Casing and screens ready for installation
Casing and screens ready for installation
Test pumping in progress
Test pumping in progress